# | PHL-SCDC REQUIERMENT | AGREEMENT |
---|
Yes | No |
SPECIMEN ANALYSIS |
---|
1 | Negative pressure room with Adequate ventilation | | |
2 | Certified Class II Biological Safety Cabinet (BSC) | | |
3 | Positive pressure room with Adequate ventilation | | |
4 | Availability of PPE including respirators (NIOSH certified N95) | | |
5 | The seal/fitness test of disposable particulate respirator for Staff | | |
6 | Training of staff for donning and doffing | | |
7 | Physical security available 24/7 to cover all shifts | | |
8 | All analyzers are maintained as per manufacturer instructions | | |
9 | All lab General equipment are calibrated at least every six months | | |
10 | Extraction and PCR Kits are validated and accepted for patient testing | | |
REPORTING OF RESULTS |
---|
1 | Use MOH HESN program for result reporting | | |
SPECIMEN STORAGE AND WASTE MANAGEMENT |
---|
1 | Specimen must be stored in an appropriate condition before and after testing in secured area | | |
2 | Autoclave must be available and maintained | | |
3 | Disinfectants solutions and biological spill kit must be available and efficient | | |
LABORATORY CAPACITY |
---|
1 | The laboratory has two Nucleic Acid extraction Systems | | |
|
2 | The laboratory has two Real-Time PCR Systems | | |
|
3 | The laboratory has at least 5 licensed Clinical Laboratory Technologists with experience in Molecular Biology and are BICSL Certified | | |
4 | The laboratory has at least one consultant Microbiologist with experience in Molecular Biology | | |
Attachments |
---|
BSC Calibration Certificate |
SCFHS for Consultant Microbiologist please scan all the 5 licenses in 1 PDF |